Introduction: Designing a home is a meticulous process that requires careful planning
and attention to detail. The enclosed image presents a detailed architectural
floor plan for a two-story house, showcasing the layout of each floor with
precise measurements and room placements. This blog post will provide an
in-depth description of the house plan, a tentative estimate of the materials
required, cost analysis, and a bar bending schedule for concrete material and
shuttering. Additionally, we will include a bank loan format for the estimate.

House plan free download with Detailed estimate and Bank loan



Ground Floor Plan: The ground floor plan features a spacious drawing room
measuring 14’4″ x 12’4″, an open area of the same dimensions, and a
kitchen sized at 10’8″ x 7’0″. The ground floor also includes a
bedroom measuring 10’8″ x 9’0″, a toilet, and a wash area. The layout
is designed to maximize space utilization while ensuring comfort and
functionality.

First Floor Plan: The first floor mirrors the ground floor in terms of
layout, with a drawing room, open area, kitchen, bedroom, toilet, and wash
area. The bedroom on the first floor measures 10’0″ x 10’0″,
providing ample space for relaxation. The first floor also includes a duct area
for ventilation.

House plan free download with Detailed estimate and Bank loan
Material Estimate and Cost Analysis:

To provide a tentative estimate of the materials required and the cost in
INR, we will consider the following components:

  1. Concrete:
    • Quantity: 100
      cubic meters
    • Rate: INR
      5,000 per cubic meter
    • Total Cost:
      INR 500,000
  2. Steel:
    • Quantity: 10
      metric tons
    • Rate: INR
      50,000 per metric ton
    • Total Cost:
      INR 500,000
  3. Bricks:
    • Quantity:
      50,000 bricks
    • Rate: INR 5
      per brick
    • Total Cost:
      INR 250,000
  4. Cement:
    • Quantity: 500
      bags
    • Rate: INR 350
      per bag
    • Total Cost:
      INR 175,000
  5. Sand:
    • Quantity: 50
      cubic meters
    • Rate: INR
      1,500 per cubic meter
    • Total Cost:
      INR 75,000
  6. Aggregates:
    • Quantity: 50
      cubic meters
    • Rate: INR
      2,000 per cubic meter
    • Total Cost:
      INR 100,000

Labour Cost:

  • Skilled Labour:
    500 man-days at INR 600 per day
  • Total Cost: INR
    300,000
  • Unskilled
    Labour: 500 man-days at INR 400 per day
  • Total Cost: INR
    200,000

Bar Bending Schedule:

  • Diameter of
    Bars: 10mm, 12mm, 16mm
  • Total Weight:
    10 metric tons
  • Cutting and
    Bending Charges: INR 5,000 per metric ton
  • Total Cost: INR
    50,000

Shuttering:

  • Area: 500
    square meters
  • Rate: INR 300
    per square meter
  • Total Cost: INR
    150,000

Bank Loan Format for Estimate:

Item Description

Quantity

Unit

Rate (INR)

Amount (INR)

Concrete

100

Cubic meters

5,000

500,000

Steel

10

Metric tons

50,000

500,000

Bricks

50,000

Units

5

250,000

Cement

500

Bags

350

175,000

Sand

50

Cubic meters

1,500

75,000

Aggregates

50

Cubic meters

2,000

100,000

Skilled Labour

500

Man-days

600

300,000

Unskilled Labour

500

Man-days

400

200,000

Bar Bending

50,000

Shuttering

500

Square meters

300

150,000

Total Estimated Cost: INR 2,300,000