The plan includes various rooms and their dimensions, which are labeled
clearly. The layout is designed to maximize the use of space efficiently. Here
is a detailed description of the house plan:
Ground Floor Plan:
- Verandah: 14'4" x
8'0"
- Drawing Room: 11'4" x
17'0"
- Kitchen: 10'8" x
8'0"
- Bedroom: 14'4" x
10'0"
- Bathroom
(BATH): 6'0" x 4'0"
- Water Closet
(W.C.): 3'0" x 4'0"
- Chowk (Storage
Area): 5'0" x 7'4"
The ground floor plan is designed to ensure functionality and comfort.
The entrance leads into an open verandah, providing a welcoming space. The
drawing room is spacious, ideal for family gatherings and relaxation. The
centrally located kitchen is easily accessible from all parts of the house. The
bedroom is designed to provide a comfortable living space, and the bathroom and
water closet are conveniently located near the kitchen and bedroom.
Tentative Estimate of Material
Required and Cost in INR
Material Estimate:
- Cement: 500 bags
- Sand: 20 cubic
meters
- Aggregate: 30 cubic
meters
- Bricks: 10,000 units
- Steel: 2 tons
- Wood: 1 cubic meter
- Tiles: 200 square
meters
- Paint: 100 liters
- Plumbing
materials: As per requirement
- Electrical
materials: As per requirement
Cost Estimate:
- Cement: ₹300 per bag x
500 bags = ₹150,000
- Sand: ₹1,500 per
cubic meter x 20 cubic meters = ₹30,000
- Aggregate: ₹1,200 per
cubic meter x 30 cubic meters = ₹36,000
- Bricks: ₹5 per unit x
10,000 units = ₹50,000
- Steel: ₹50,000 per
ton x 2 tons = ₹100,000
- Wood: ₹50,000 per
cubic meter x 1 cubic meter = ₹50,000
- Tiles: ₹500 per
square meter x 200 square meters = ₹100,000
- Paint: ₹200 per liter
x 100 liters = ₹20,000
- Plumbing
materials: ₹50,000
- Electrical
materials: ₹50,000
Total Estimated Cost: ₹636,000
House plan free download with Detailed estimate and Bank loan |
Detailed Rate Analysis for Material
and Labour
Material:
- Cement: ₹300 per bag
- Sand: ₹1,500 per
cubic meter
- Aggregate: ₹1,200 per
cubic meter
- Bricks: ₹5 per unit
- Steel: ₹50,000 per
ton
- Wood: ₹50,000 per
cubic meter
- Tiles: ₹500 per
square meter
- Paint: ₹200 per liter
- Plumbing
materials: ₹50,000 (lump sum)
- Electrical
materials: ₹50,000 (lump sum)
Labour:
- Mason: ₹500 per day
- Carpenter: ₹600 per day
- Electrician: ₹700 per day
- Plumber: ₹600 per day
- Painter: ₹500 per day
- Helper: ₹300 per day
Bar Bending Schedule for Concrete
Material and Shuttering
Concrete Material:
- Footing: 0.5 tons of
steel
- Columns: 0.5 tons of
steel
- Beams: 0.5 tons of
steel
- Slab: 0.5 tons of
steel
Shuttering:
- Plywood: 50 sheets
- Props: 100 units
- Clamps: 200 units
Bank Loan Format of Estimate
Project Cost:
- Total Material
Cost: ₹636,000
- Total Labour
Cost: ₹200,000
- Total Project
Cost: ₹836,000