House Plan -15' X 50'-CAD File-FREE Download with Detailed Estimate of Material and Bank loan Estimate

The plan includes various rooms and their dimensions, which are labeled clearly. The layout is designed to maximize the use of space efficiently. Here is a detailed description of the house plan:

Ground Floor Plan:

  • Verandah: 14'4" x 8'0"
  • Drawing Room: 11'4" x 17'0"
  • Kitchen: 10'8" x 8'0"
  • Bedroom: 14'4" x 10'0"
  • Bathroom (BATH): 6'0" x 4'0"
  • Water Closet (W.C.): 3'0" x 4'0"
  • Chowk (Storage Area): 5'0" x 7'4"
House plan free download with Detailed estimate and Bank loan


The ground floor plan is designed to ensure functionality and comfort. The entrance leads into an open verandah, providing a welcoming space. The drawing room is spacious, ideal for family gatherings and relaxation. The centrally located kitchen is easily accessible from all parts of the house. The bedroom is designed to provide a comfortable living space, and the bathroom and water closet are conveniently located near the kitchen and bedroom.

Tentative Estimate of Material Required and Cost in INR

Material Estimate:

  1. Cement: 500 bags
  2. Sand: 20 cubic meters
  3. Aggregate: 30 cubic meters
  4. Bricks: 10,000 units
  5. Steel: 2 tons
  6. Wood: 1 cubic meter
  7. Tiles: 200 square meters
  8. Paint: 100 liters
  9. Plumbing materials: As per requirement
  10. Electrical materials: As per requirement

Cost Estimate:

  1. Cement: ₹300 per bag x 500 bags = ₹150,000
  2. Sand: ₹1,500 per cubic meter x 20 cubic meters = ₹30,000
  3. Aggregate: ₹1,200 per cubic meter x 30 cubic meters = ₹36,000
  4. Bricks: ₹5 per unit x 10,000 units = ₹50,000
  5. Steel: ₹50,000 per ton x 2 tons = ₹100,000
  6. Wood: ₹50,000 per cubic meter x 1 cubic meter = ₹50,000
  7. Tiles: ₹500 per square meter x 200 square meters = ₹100,000
  8. Paint: ₹200 per liter x 100 liters = ₹20,000
  9. Plumbing materials: ₹50,000
  10. Electrical materials: ₹50,000

Total Estimated Cost: ₹636,000

House plan free download with Detailed estimate and Bank loan


Detailed Rate Analysis for Material and Labour

Material:

  1. Cement: ₹300 per bag
  2. Sand: ₹1,500 per cubic meter
  3. Aggregate: ₹1,200 per cubic meter
  4. Bricks: ₹5 per unit
  5. Steel: ₹50,000 per ton
  6. Wood: ₹50,000 per cubic meter
  7. Tiles: ₹500 per square meter
  8. Paint: ₹200 per liter
  9. Plumbing materials: ₹50,000 (lump sum)
  10. Electrical materials: ₹50,000 (lump sum)

Labour:

  1. Mason: ₹500 per day
  2. Carpenter: ₹600 per day
  3. Electrician: ₹700 per day
  4. Plumber: ₹600 per day
  5. Painter: ₹500 per day
  6. Helper: ₹300 per day

Bar Bending Schedule for Concrete Material and Shuttering

Concrete Material:

  1. Footing: 0.5 tons of steel
  2. Columns: 0.5 tons of steel
  3. Beams: 0.5 tons of steel
  4. Slab: 0.5 tons of steel

Shuttering:

  1. Plywood: 50 sheets
  2. Props: 100 units
  3. Clamps: 200 units

Bank Loan Format of Estimate

Project Cost:

  • Total Material Cost: ₹636,000
  • Total Labour Cost: ₹200,000
  • Total Project Cost: ₹836,000