Introduction: Designing a home is a meticulous process that requires careful planning
and attention to detail. The enclosed image presents a detailed architectural
floor plan for a two-story house, showcasing the layout of each floor with
precise measurements and room placements. This blog post will provide an
in-depth description of the house plan, a tentative estimate of the materials
required, cost analysis, and a bar bending schedule for concrete material and
shuttering. Additionally, we will include a bank loan format for the estimate.
House plan free download with Detailed estimate and Bank loan |
Ground Floor Plan: The ground floor plan features a spacious drawing room measuring 14'4" x 12'4", an open area of the same dimensions, and a kitchen sized at 10'8" x 7'0". The ground floor also includes a bedroom measuring 10'8" x 9'0", a toilet, and a wash area. The layout is designed to maximize space utilization while ensuring comfort and functionality.
First Floor Plan: The first floor mirrors the ground floor in terms of
layout, with a drawing room, open area, kitchen, bedroom, toilet, and wash
area. The bedroom on the first floor measures 10'0" x 10'0",
providing ample space for relaxation. The first floor also includes a duct area
for ventilation.
House plan free download with Detailed estimate and Bank loan |
To provide a tentative estimate of the materials required and the cost in
INR, we will consider the following components:
- Concrete:
- Quantity: 100
cubic meters
- Rate: INR
5,000 per cubic meter
- Total Cost:
INR 500,000
- Steel:
- Quantity: 10
metric tons
- Rate: INR
50,000 per metric ton
- Total Cost:
INR 500,000
- Bricks:
- Quantity:
50,000 bricks
- Rate: INR 5
per brick
- Total Cost:
INR 250,000
- Cement:
- Quantity: 500
bags
- Rate: INR 350
per bag
- Total Cost:
INR 175,000
- Sand:
- Quantity: 50
cubic meters
- Rate: INR
1,500 per cubic meter
- Total Cost:
INR 75,000
- Aggregates:
- Quantity: 50
cubic meters
- Rate: INR
2,000 per cubic meter
- Total Cost:
INR 100,000
Labour Cost:
- Skilled Labour:
500 man-days at INR 600 per day
- Total Cost: INR
300,000
- Unskilled
Labour: 500 man-days at INR 400 per day
- Total Cost: INR
200,000
Bar Bending Schedule:
- Diameter of
Bars: 10mm, 12mm, 16mm
- Total Weight:
10 metric tons
- Cutting and
Bending Charges: INR 5,000 per metric ton
- Total Cost: INR
50,000
Shuttering:
- Area: 500
square meters
- Rate: INR 300
per square meter
- Total Cost: INR
150,000
Bank Loan Format for Estimate:
Item Description |
Quantity |
Unit |
Rate (INR) |
Amount (INR) |
Concrete |
100 |
Cubic meters |
5,000 |
500,000 |
Steel |
10 |
Metric tons |
50,000 |
500,000 |
Bricks |
50,000 |
Units |
5 |
250,000 |
Cement |
500 |
Bags |
350 |
175,000 |
Sand |
50 |
Cubic meters |
1,500 |
75,000 |
Aggregates |
50 |
Cubic meters |
2,000 |
100,000 |
Skilled Labour |
500 |
Man-days |
600 |
300,000 |
Unskilled Labour |
500 |
Man-days |
400 |
200,000 |
Bar Bending |
- |
- |
- |
50,000 |
Shuttering |
500 |
Square meters |
300 |
150,000 |
Total Estimated Cost: INR 2,300,000