House Plan -15' X 50'-CAD File-FREE Download with Detailed Estimate of Material and Bank loan Estimate

Introduction: Designing a home is a meticulous process that requires careful planning and attention to detail. The enclosed image presents a detailed architectural floor plan for a two-story house, showcasing the layout of each floor with precise measurements and room placements. This blog post will provide an in-depth description of the house plan, a tentative estimate of the materials required, cost analysis, and a bar bending schedule for concrete material and shuttering. Additionally, we will include a bank loan format for the estimate.

House plan free download with Detailed estimate and Bank loan


Ground Floor Plan: The ground floor plan features a spacious drawing room measuring 14'4" x 12'4", an open area of the same dimensions, and a kitchen sized at 10'8" x 7'0". The ground floor also includes a bedroom measuring 10'8" x 9'0", a toilet, and a wash area. The layout is designed to maximize space utilization while ensuring comfort and functionality.

First Floor Plan: The first floor mirrors the ground floor in terms of layout, with a drawing room, open area, kitchen, bedroom, toilet, and wash area. The bedroom on the first floor measures 10'0" x 10'0", providing ample space for relaxation. The first floor also includes a duct area for ventilation.

House plan free download with Detailed estimate and Bank loan

Material Estimate and Cost Analysis:

To provide a tentative estimate of the materials required and the cost in INR, we will consider the following components:

  1. Concrete:
    • Quantity: 100 cubic meters
    • Rate: INR 5,000 per cubic meter
    • Total Cost: INR 500,000
  2. Steel:
    • Quantity: 10 metric tons
    • Rate: INR 50,000 per metric ton
    • Total Cost: INR 500,000
  3. Bricks:
    • Quantity: 50,000 bricks
    • Rate: INR 5 per brick
    • Total Cost: INR 250,000
  4. Cement:
    • Quantity: 500 bags
    • Rate: INR 350 per bag
    • Total Cost: INR 175,000
  5. Sand:
    • Quantity: 50 cubic meters
    • Rate: INR 1,500 per cubic meter
    • Total Cost: INR 75,000
  6. Aggregates:
    • Quantity: 50 cubic meters
    • Rate: INR 2,000 per cubic meter
    • Total Cost: INR 100,000

Labour Cost:

  • Skilled Labour: 500 man-days at INR 600 per day
  • Total Cost: INR 300,000
  • Unskilled Labour: 500 man-days at INR 400 per day
  • Total Cost: INR 200,000

Bar Bending Schedule:

  • Diameter of Bars: 10mm, 12mm, 16mm
  • Total Weight: 10 metric tons
  • Cutting and Bending Charges: INR 5,000 per metric ton
  • Total Cost: INR 50,000

Shuttering:

  • Area: 500 square meters
  • Rate: INR 300 per square meter
  • Total Cost: INR 150,000

Bank Loan Format for Estimate:

Item Description

Quantity

Unit

Rate (INR)

Amount (INR)

Concrete

100

Cubic meters

5,000

500,000

Steel

10

Metric tons

50,000

500,000

Bricks

50,000

Units

5

250,000

Cement

500

Bags

350

175,000

Sand

50

Cubic meters

1,500

75,000

Aggregates

50

Cubic meters

2,000

100,000

Skilled Labour

500

Man-days

600

300,000

Unskilled Labour

500

Man-days

400

200,000

Bar Bending

-

-

-

50,000

Shuttering

500

Square meters

300

150,000

Total Estimated Cost: INR 2,300,000