Every construction required various forms to perform necessary action at the time of construction. This post provides the Change order format for Site work. Change Order is very integral part of ongoing construction which allows the customer or contractor to raise the financial changes to the existing contract.
Introduction
Change order is a format allows the every customer or contractor to raise the financial changes which might be negative or positive for the existing contract.
Examples of Change Order
Change order format consist lots of information based on the Type of the changes, lets take an example as below.
Example 1 :
If you are performing the "Detailed Project Report for Highway Project" and its required the extension of time then Change order is a Valuable document to change the Contract Amount and Time.
Example 2:
If the Contractor performing the Construction of High Rise Building and it observed that it required the Extra time or he observed the missing item then he can raise the Change order to get the Scope in the Ongoing Contract and extend the time along with the Cost.
What are the elements of Change Order ?
Change order format consist the following aspects:
- Additional of Direct Cost Such as extra labour, material and equipment requirement
- Deduction of Direct Cost such as removal of material, labour quantity and machineries
- Contractor total cost
- Subcontractor Cost
- Mark ups on the Cost
- Description of Change
- Project Number
- Contract Number
- Date
- BOQ quantity reference
Please click on the below button to download the "Change Order format for Site Work"
Watch the detailed Video for more understanding.
0 Comments