It is important to take certain safety measures in order to make the best mortar possible using the ingredients at hand. To get the most out of the mortar mix, the following elements need to be taken into account.
Take caution when using a mortar
Take These Precautions When Using Mortar Mix
Small amounts of mortar should be mixed in advance to ensure
that it may be utilized quickly before solidifying. It is never appropriate to
utilize mortar that has already set. The maximum durations for several types of
mortar are as follows:
If hydraulic lime (Class A lime) is a component of the
mortar, it must be utilized within four hours of being ground.
Should cinders or surki be an ingredient in the mortar, it
must be utilized within twenty-four (24) hours of being ground.
The window of opportunity for cement mortar is ninety
minutes following the addition of water.
Useful bricks or stones in masonry construction should be
completely submerged in water for at least 12 hours prior to being utilized in
mortar work. It will stop the mortar from absorbing moisture before it
solidifies.
There shouldn't be too much water in the mortar. It need to
be as rigid as possible without causing any discomfort.
When preparing the mortar mix, use fresh water. There should
be no oils, dust, alkalies, etc. in the water.
It is best to avoid using seawater in mortar mixtures.
Mortar should be packed into the joints tightly.
It is recommended to keep mortar works wet for a week or two
following casting. It will stop mortar from drying out too quickly, especially
in hot weather.
Frosty weather should be avoided since it interferes with
the cement's ability to cure.