Estimation and costing of Building

Estimate of Building means to calculate the quantity and identifying the cost. In this post i have prepared the online tool which provide the Building quantity and cost. You need to put the values in highlighted colors to get good approximate estimate.

Before use of the following tool of building estimation watch the following video for more understanding.

Approximate Building Construction Cost Estimate
Total Area:sft
Project Cost in Rs.:Rs
Project Labor Cost in Rs.:Rs
Bill of Quantity
By :Parag Kamlakar Pal (Founder of CivilNotess)
ItemQuantityUnitRateTotal Amount
BazriCUM
Binding WireKg
BitumenKg
Brick BlastCUM
Brick TilesNOS
BricksNOS
CementBags
Cement for Base CoarseBags
Cement PaintSqM
CI PipeMeter
Coarse SandCUM
HardwoodRFT
EarthCUM
Fine SandCUM
Glaze TileSqM
Hard Wood ShutterNOS
Hardwood and Commercial PlyboardNOS
Hardwood Window ShutterNOS
Iron GrillsKg
Labour cost for Brick Sup. Str
Labour cost for Brick Tiles
Labour cost for Brick Work Foundation
Labour cost for Ceiling Plaster
Lab costour for Cement Concrete
Labour cost for Ceramic Glaze Tile
Labour cost for DPC
Labour cost for Earth Excavation work
Labour cost for piping work
Labour cost for Pointing
Labour cost for RCC
Labour cost for Steel RCC
Labour cost for Wall Plaster
MS SteelKg
Oil Bound Distemper with LabourSqM
Paint Work with LabourSqM
SandCUM
ShutteringSFT
Stone BlastCUM
White CementBags
Sub Total:
Add 10% for Electric fitting wiring & Labor:
Add 10% for Water Supply fitting & Sanitary:
Add 5% for Sewerage:
Grand Total:

Note : This tool provide only approximate estimate for the Building. If you want to learn Building estimation using a plan watch more video on http://www.civilnotess.com/estimation-and-costing-of-building.html